Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Hydraulic Utility Lifts
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 183,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,246 3,067,116
kWh
Natural Gas $86,086 15,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,350 $270 $2,350
43,669
kWh
-
02 2.4226: Use / purchase optimum sized compressor $3,400 $3,500 $3,400
121,336
kWh
-
03 2.3137: Use power during off-peak periods $7,853 - $7,853
-
kWh
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,311 $680 - $2,311
-
MMBtu
05 2.7314: Reduce ventilation air $17,508 $85,800 $1,272
21,395
kWh
$16,236
-
MMBtu
TOTAL RECOMMENDED $33,422 $90,250 $14,875
186,400
kWh
$18,547
-
MMBtu
TOTAL IMPLEMENTED $2,350 $270 $2,350
43,669
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs