ITAC Assessment: NC0016
ITAC logo
ITAC Assessment: NC0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product WOOD CHAIRS AND TABLES
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 683
Plant Area 544,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $622,330 11,620,164
kWh
Natural Gas $7,517 693
MMBtu
Coal $147,117 86,265
MMBtu
Other Energy $36,266 9,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $234,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Wood Savings Other Energy Savings
01 2.1222: Install turbulators $68,797 $3,000 - $68,797
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $11,812 $15,750 - $11,812
-
MMBtu
- -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $5,634 $38,500 $7,338
183,470
kWh
$(-1,704.0)
-
MMBtu
- -
04 2.7313: Recycle air for heating, ventilation and air conditioning $42,728 $34,300 - - - $42,728
-
MMBtu
05 2.2515: Use optimum thickness insulation $61,266 $133,293 - - - $61,266
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,603 $1,000 $1,603
29,601
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,831 $960 $1,831
33,998
kWh
- - -
08 2.1331: Burn a less expensive grade of fuel $40,563 $118,090 - $147,117
-
MMBtu
$(-106,554.0)
-
MMBtu
-
TOTAL RECOMMENDED $234,234 $344,893 $10,772
247,069
kWh
$226,022
-
MMBtu
$(-106,554.0)
-
MMBtu
$103,994
-
MMBtu
TOTAL IMPLEMENTED $1,831 $960 $1,831
33,998
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings Wood Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs