ITAC Assessment: NC0015
ITAC logo
ITAC Assessment: NC0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 220,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,415 5,503,517
kWh
Natural Gas $180,010 48,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $12,600 $25,000 - $12,600
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,926 - $2,926
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $47,142 $30,148 $47,142
873,388
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,242 $2,002 $13,242
245,311
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,985 $600 - $2,985
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,316 $330 $2,316
42,790
kWh
-
07 2.4133: Use most efficient type of electric motors $6,488 $9,470 $6,488
120,164
kWh
-
TOTAL RECOMMENDED $87,699 $67,550 $72,114
1,281,653
kWh
$15,585
-
MMBtu
TOTAL IMPLEMENTED $58,872 $39,948 $58,872
1,036,342
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs