Assessment Year | 1993 |
---|---|
Principal Product | Metal File Cabinets |
NAICS |
n/a
|
SIC | 2522: Office Furniture, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
273,600
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,625
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,802 | 4,827,960 |
kWh
|
$0.048 |
Natural Gas | $139,200 | 41,822 |
MMBtu
|
$3.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,974 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $6,237 | $750 | - |
$6,237
-
MMBtu
|
- | |
02 | 2.2612: Use cooling tower water instead of refrigeration | $3,254 | $3,500 |
$3,254
44,842
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $5,091 | $13,201 |
$5,091
106,096
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,736 | $13,007 |
$3,736
77,667
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,196 | $180 |
$2,196
45,721
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,395 | $2,500 | - |
$1,395
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,260 | $12,244 |
$(-33.0)
(-586)
kWh
|
- | $5,293 | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $1,691 | $150 |
$1,691
31,653
kWh
|
- | - | |
09 | 2.2531: Re-size charging openings or add movable cover or door | $347 | $330 | - |
$347
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $29,207 | $45,862 |
$15,935
305,393
kWh
|
$7,979
-
MMBtu
|
$5,293 | ||
TOTAL IMPLEMENTED | $17,974 | $38,782 |
$12,681
260,551
kWh
|
- | $5,293 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs