ITAC Assessment: NC0004
ITAC logo
ITAC Assessment: NC0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Steel Buildings
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 194,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,995 5,455,158
kWh
Natural Gas $71,649 17,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,423 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,514 $1,222 $6,514
95,838
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,054 $690 $1,054
15,533
kWh
- -
03 3.4115: Recover and reuse cooling water $834 $500 - - $834
-
MMBtu
04 2.2437: Recover waste heat from equipment $26,384 $1,500 - $26,384
-
MMBtu
-
05 2.4131: Size electric motors for peak operating efficiency $1,143 $1,100 $1,143
16,706
kWh
- -
06 2.7241: Install outside air damper / economizer on hvac unit $1,494 $4,500 $1,494
21,981
kWh
- -
TOTAL RECOMMENDED $37,423 $9,512 $10,205
150,058
kWh
$26,384
-
MMBtu
$834
-
MMBtu
TOTAL IMPLEMENTED $7,568 $1,912 $7,568
111,371
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs