ITAC Assessment: MZ1018
ITAC logo
ITAC Assessment: MZ1018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 186,617
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,144 2,549,760
kWh
Electricity Demand $24,714 5,325
kW-mo/yr
Natural Gas $68,051 7,134
MMBtu
Waste Disposal Costs
Water Usage $15,054 3,102
Tgal
Water Disposal $25,284 3,063
Tgal
TOTAL YEARLY COSTS $339,247
RECOMMENDED SAVINGS* $37,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,704 $7,400 $1,704
21,039
kWh
- - -
02 2.7135: Install occupancy sensors $447 $1,245 $447
5,593
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $1,533 - $851
10,512
kWh
- $682
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,014 $5,835 $5,747
70,956
kWh
$451
-
kW-mo/yr
- $816
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $26,551 $160,000 $6,868
84,795
kWh
$538
-
kW-mo/yr
$19,145
-
MMBtu
-
TOTAL RECOMMENDED $37,249 $174,480 $15,617
192,895
kWh
$989
-
kW-mo/yr
$19,827
-
MMBtu
$816
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs