ITAC Assessment: MZ1017
ITAC logo
ITAC Assessment: MZ1017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 45,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,918 429,660
kWh
Electricity Demand $32,825 1,759
kW-mo/yr
Natural Gas $8,845 781
MMBtu
Waste Disposal Costs
Water Usage $22,567 6,865
Tgal
Water Disposal $15,655 4,241
Tgal
TOTAL YEARLY COSTS $113,810
RECOMMENDED SAVINGS* $1,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2515: Use optimum thickness insulation $244 $634 - - $244
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $533 $700 $239
3,066
kWh
$112
-
kW-mo/yr
- $182
03 2.6218: Turn off equipment when not in use $342 $60 $249
3,154
kWh
$93
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,119 $1,394 $488
6,220
kWh
$205
-
kW-mo/yr
$244
-
MMBtu
$182
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs