ITAC Assessment: MZ1002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fire Station
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range less than $500
k
# of Employees 100
Plant Area 16,050
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,048 170,720
kWh
Natural Gas $6,947 586
MMBtu
Waste Disposal Costs
Water Usage $1,737 217
Tgal
TOTAL YEARLY COSTS $25,732
RECOMMENDED SAVINGS* $8,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $1,926 $1,660 $1,926
19,282
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,984 $3,805 $1,347
13,490
kWh
- $637
03 2.7221: Lower temperature during the winter season and vice-versa $4,387 $2,260 $2,293
22,970
kWh
$2,094
-
MMBtu
-
04 2.7135: Install occupancy sensors $96 $310 $96
960
kWh
- -
TOTAL RECOMMENDED $8,393 $8,035 $5,662
56,702
kWh
$2,094
-
MMBtu
$637
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs