ITAC Assessment: LT8439
ITAC logo
ITAC Assessment: LT8439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product General Medical and Surgical Services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 38,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,060 2,008,981
kWh
Electricity Demand $83,859 4,930
kW-mo/yr
Electricity Fees $22,691 -
Natural Gas $32,619 2,532
MMBtu
Other Gas $1,961 1
MMBtu
Waste Disposal Costs
Water Usage $4,191 847
Tgal
Water Disposal $4,915 847
Tgal
Other Liquid (non-haz) $891 1
gal
TOTAL YEARLY COSTS $291,187
RECOMMENDED SAVINGS* $21,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $316 - $7
99
kWh
- $309
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,687 $9,761 $20,687
295,533
kWh
- -
03 2.7134: Use photocell controls $383 $393 $383
5,475
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $519 $5,750 $377
5,384
kWh
$15
-
kW-mo/yr
$127
-
MMBtu
TOTAL RECOMMENDED $21,905 $15,903 $21,454
306,491
kWh
$15
-
kW-mo/yr
$436
-
MMBtu
TOTAL IMPLEMENTED - - - - -