ITAC Assessment: MZ0397
ITAC logo
ITAC Assessment: MZ0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product medicinal vials
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 151,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,979 3,467,520
kWh
Electricity Demand $27,602 6,821
kW-mo/yr
Natural Gas $15,059 1,480
MMBtu
Waste Disposal Costs
Water Usage $5,810 2,639
Tgal
Water Disposal $22,165 2,639
Tgal
TOTAL YEARLY COSTS $359,615
RECOMMENDED SAVINGS* $110,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $941 $600 $824
9,932
kWh
$117
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,988 $9,887 $919
11,088
kWh
$131
-
kW-mo/yr
- $1,938
03 2.7135: Install occupancy sensors $893 $1,600 $893
10,761
kWh
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $15,228 - $6,911
83,261
kWh
- $8,317
-
MMBtu
-
05 2.2622: Replace existing chiller with high efficiency model $88,780 $279,688 $83,219
1,002,638
kWh
$5,561
-
kW-mo/yr
- -
06 2.9112: Use solar heat to heat water $1,731 $33,250 - - $1,731
-
MMBtu
-
TOTAL RECOMMENDED $110,561 $325,025 $92,766
1,117,680
kWh
$5,809
-
kW-mo/yr
$10,048
-
MMBtu
$1,938
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs