ITAC Assessment: MZ0393
ITAC logo
ITAC Assessment: MZ0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pharmaceutical formulation
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 23,510
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $595,216 6,841,563
kWh
Electricity Demand $52,213 11,948
kW-mo/yr
Natural Gas $166,382 20,730
MMBtu
Waste Disposal Costs
Water Usage $75,971 21,120
Tgal
TOTAL YEARLY COSTS $889,782
RECOMMENDED SAVINGS* $71,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,888 $360 $5,508
63,312
kWh
$380
-
kW-mo/yr
-
02 2.2622: Replace existing chiller with high efficiency model $18,343 $120,000 $16,639
191,251
kWh
$1,704
-
kW-mo/yr
-
03 2.2622: Replace existing chiller with high efficiency model $16,508 $90,093 $14,511
166,799
kWh
$1,997
-
kW-mo/yr
-
04 2.2625: Chill water to the highest temperature possible $9,886 $16,248 $8,690
99,896
kWh
$1,196
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,116 $2,000 - - $4,116
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,569 $19,800 $7,569
86,996
kWh
- -
07 2.7135: Install occupancy sensors $82 $425 $82
936
kWh
- -
08 2.2414: Use waste heat from hot flue gases to preheat $8,742 $70,000 - - $8,742
-
MMBtu
TOTAL RECOMMENDED $71,134 $318,926 $52,999
609,190
kWh
$5,277
-
kW-mo/yr
$12,858
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs