ITAC Assessment: MZ0354
ITAC logo
ITAC Assessment: MZ0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product plastic dispensers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 465,000
ft2
Annual Production 378,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,998,908 30,643,841
kWh
Electricity Demand $462,887 55,620
kW-mo/yr
Natural Gas $51,388 11,451
MMBtu
Waste Disposal Costs
Water Usage $172,392 12,557
Tgal
TOTAL YEARLY COSTS $2,685,575
RECOMMENDED SAVINGS* $71,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,120 $1,100 $14,429
222,044
kWh
$3,691
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $6,143 $20,027 $6,143
94,500
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,000 $300 $1,702
26,179
kWh
$298
-
kW-mo/yr
04 2.7135: Install occupancy sensors $984 $700 $984
15,137
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $43,767 $294,662 $27,069
416,455
kWh
$16,698
-
kW-mo/yr
TOTAL RECOMMENDED $71,014 $316,789 $50,327
774,315
kWh
$20,687
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs