ITAC Assessment: MZ0344
ITAC logo
ITAC Assessment: MZ0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product treated municipal wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 7
Plant Area 210,000
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,963 4,938,436
kWh
TOTAL YEARLY COSTS $368,963
RECOMMENDED SAVINGS* $139,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,614 $750 $2,614
34,848
kWh
02 2.7135: Install occupancy sensors $1,547 $1,000 $1,547
20,623
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,110 $32,240 $61,110
814,802
kWh
04 2.6231: Utilize controls to operate equipment only when needed $59,175 - $59,175
789,000
kWh
05 2.6231: Utilize controls to operate equipment only when needed $15,137 $12,000 $15,137
201,830
kWh
TOTAL RECOMMENDED $139,583 $45,990 $139,583
1,861,103
kWh
TOTAL IMPLEMENTED $124,446 $33,990 $124,446
1,659,273
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs