ITAC Assessment: MZ0336
ITAC logo
ITAC Assessment: MZ0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal food cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 210,000
ft2
Annual Production 1,700,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $721,479 14,605,004
kWh
Electricity Demand $246,404 23,046
kW-mo/yr
Natural Gas $523,876 75,511
MMBtu
Waste Disposal Costs
Water Usage $99,727 30,964
Tgal
TOTAL YEARLY COSTS $1,591,486
RECOMMENDED SAVINGS* $215,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,963 $2,020 $1,963
39,262
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $14,175 $53,900 $10,964
219,280
kWh
$3,211
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $774 - $593
11,850
kWh
$181
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $11,688 $5,500 $9,041
180,814
kWh
$2,647
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $31,782 $11,200 - - $31,782
-
MMBtu
06 2.9114: Use solar heat to make electricty $154,719 $1,434,375 $105,447
2,108,938
kWh
$49,272
-
kW-mo/yr
-
TOTAL RECOMMENDED $215,101 $1,506,995 $128,008
2,560,144
kWh
$55,311
-
kW-mo/yr
$31,782
-
MMBtu
TOTAL IMPLEMENTED $47,920 $67,120 $12,927
258,542
kWh
$3,211
-
kW-mo/yr
$31,782
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs