ITAC Assessment: MZ0312
ITAC logo
ITAC Assessment: MZ0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product treated municipal waste
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 25
Plant Area 1,742,000
ft2
Annual Production 5,840,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,964 7,384,610
kWh
Electricity Demand $112,100 14,054
kW-mo/yr
Waste Disposal Costs
Water Usage $64,701 10,120
Tgal
TOTAL YEARLY COSTS $668,765
RECOMMENDED SAVINGS* $44,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $19,186 $216,865 $19,186
286,361
kWh
-
02 2.3322: Use existing dam to generate electricity $20,946 $306,240 $18,009
268,797
kWh
$2,937
-
kW-mo/yr
03 2.3212: Optimize plant power factor $2,207 $8,156 - $2,207
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,140 $480 $1,140
17,045
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $720 $1,350 $565
8,437
kWh
$155
-
kW-mo/yr
TOTAL RECOMMENDED $44,199 $533,091 $38,900
580,640
kWh
$5,299
-
kW-mo/yr
TOTAL IMPLEMENTED $1,860 $1,830 $1,705
25,482
kWh
$155
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs