ITAC Assessment: GT0490
ITAC logo
ITAC Assessment: GT0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Polyester / Cotton Cloth
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 411
Plant Area
n/a
Annual Production 2,800,000
thousand feet
Production Hrs. Annual 8,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,257,674 31,002,345
kWh
Natural Gas $87,750 33,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,080 - - $1,080
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $4,060 $9,600 - $4,060
-
MMBtu
03 2.1242: Minimize boiler blowdown with better feedwater treatment $840 - - $840
-
MMBtu
04 2.4133: Use most efficient type of electric motors $34,740 $27,740 $34,740
855,803
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,270 - $15,270
376,319
kWh
-
06 2.2531: Re-size charging openings or add movable cover or door $620 - $620
15,240
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,950 - $1,950
48,066
kWh
-
08 2.7135: Install occupancy sensors $2,650 $1,010 $2,650
65,064
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $28,275 $87,090 $28,275
696,659
kWh
-
TOTAL RECOMMENDED $89,485 $125,440 $83,505
2,057,151
kWh
$5,980
-
MMBtu
TOTAL IMPLEMENTED $56,310 $28,750 $55,230
1,360,492
kWh
$1,080
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs