ITAC Assessment: MZ0307
ITAC logo
ITAC Assessment: MZ0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product CNC machines
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 47,000
ft2
Annual Production 26
units
Production Hrs. Annual 2,600
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,316 795,803
kWh
Electricity Demand $27,144 4,508
kW-mo/yr
Electricity Fees $294 -
Natural Gas $7,008 1,040
MMBtu
TOTAL YEARLY COSTS $103,762
RECOMMENDED SAVINGS* $10,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,351 $1,250 - $6,351
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,100 $6,233 $2,350
26,975
kWh
$750
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $809 $1,130 $765
8,786
kWh
$244
-
kW-mo/yr
$(-200.0)
TOTAL RECOMMENDED $10,260 $8,613 $3,115
35,761
kWh
$7,345
-
kW-mo/yr
$(-200.0)
TOTAL IMPLEMENTED $3,909 $7,363 $3,115
35,761
kWh
$994
-
kW-mo/yr
$(-200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs