ITAC Assessment: MZ0283
ITAC logo
ITAC Assessment: MZ0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product treated mucicipal wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 4
Plant Area 348,480
ft2
Annual Production 3,760
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,765 3,238,700
kWh
Electricity Demand $21,980 5,941
kW-mo/yr
Natural Gas $15,440 1,982
MMBtu
TOTAL YEARLY COSTS $278,184
RECOMMENDED SAVINGS* $132,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,320 $320 $2,172
29,354
kWh
$148
-
kW-mo/yr
-
02 4.212: Adopt in-house material generation $14,280 $43,150 - - $14,280
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $36 $20 $34
456
kWh
$2
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $221 $1,096 $221
2,983
kWh
- -
05 3.6192: Use a less expensive method of waste removal $74,880 - - - $74,880
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,743 $12,366 $35,834
484,241
kWh
$4,909
-
kW-mo/yr
-
TOTAL RECOMMENDED $132,480 $56,952 $38,261
517,034
kWh
$5,059
-
kW-mo/yr
$89,160
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs