| Assessment Year | 2019 |
|---|---|
| Principal Product | treated mucicipal wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 4 |
| Plant Area |
348,480
ft2
|
| Annual Production | 3,760
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $240,765 | 3,238,700 |
kWh
|
$0.074 |
| Electricity Demand | $21,980 | 5,941 |
kW-mo/yr
|
$3.70 |
| Natural Gas | $15,440 | 1,982 |
MMBtu
|
$7.79 |
| TOTAL YEARLY COSTS | $278,184 | |||
| RECOMMENDED SAVINGS* | $132,480 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,320 | $320 |
$2,172
29,354
kWh
|
$148
-
kW-mo/yr
|
- | |
| 02 | 4.212: Adopt in-house material generation | $14,280 | $43,150 | - | - | $14,280 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $36 | $20 |
$34
456
kWh
|
$2
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $221 | $1,096 |
$221
2,983
kWh
|
- | - | |
| 05 | 3.6192: Use a less expensive method of waste removal | $74,880 | - | - | - | $74,880 | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,743 | $12,366 |
$35,834
484,241
kWh
|
$4,909
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $132,480 | $56,952 |
$38,261
517,034
kWh
|
$5,059
-
kW-mo/yr
|
$89,160 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs