ITAC Assessment: MZ0281
ITAC logo
ITAC Assessment: MZ0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Nonferrous aluminum and copper investment castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 72,000
ft2
Annual Production 207,326
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,346 6,024,960
kWh
Electricity Demand $51,669 15,692
kW-mo/yr
Natural Gas $81,468 17,821
MMBtu
Waste Disposal Costs
Water Usage $8,362 20
Tgal
TOTAL YEARLY COSTS $542,845
RECOMMENDED SAVINGS* $26,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2424: Use heat in flue gases to preheat products or materials $22,302 $48,220 - - $22,302
-
MMBtu
-
02 2.7144: Install spectral reflectors / delamp $1,877 $396 $1,017
15,418
kWh
$68
-
kW-mo/yr
- $792
03 2.7135: Install occupancy sensors $98 $250 $98
1,458
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,486 $720 - - $2,486
-
MMBtu
-
TOTAL RECOMMENDED $26,763 $49,586 $1,115
16,876
kWh
$68
-
kW-mo/yr
$24,788
-
MMBtu
$792
TOTAL IMPLEMENTED - - - - - -