ITAC Assessment: AR0023
ITAC logo
ITAC Assessment: AR0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Graded Lightweight Aggregate
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $5
M
to 10
M
# of Employees 36
Plant Area 102,000
ft2
Annual Production 1,500,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $419,425 7,700,176
kWh
Natural Gas $130,852 45,700
MMBtu
Fuel Oil #2 $79,353 17,436
MMBtu
Coal $1,027,088 580,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $4,012 - $4,012
73,564
kWh
-
02 2.4134: Replace electric motor with fossil fuel engine $101,949 $59,000 $135,062
2,996,776
kWh
$(-33,113.0)
-
MMBtu
03 2.3212: Optimize plant power factor $12,592 $20,205 $12,592
-
kWh
-
04 2.4133: Use most efficient type of electric motors $9,010 $8,910 $9,010
165,592
kWh
-
TOTAL RECOMMENDED $127,563 $88,115 $160,676
3,235,932
kWh
$(-33,113.0)
-
MMBtu
TOTAL IMPLEMENTED $25,614 $29,115 $25,614
239,156
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs