ITAC Assessment: MZ0277
ITAC logo
ITAC Assessment: MZ0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cookies
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 400,000
ft2
Annual Production 232,000,000
lb
Production Hrs. Annual 6,840
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $798,465 18,536,800
kWh
Electricity Demand $664,704 35,154
kW-mo/yr
Natural Gas $1,013,333 259,216
MMBtu
Waste Disposal Costs
Water Usage $41,654 14,867,096
Tgal
Water Disposal $91,558 14,867
Tgal
TOTAL YEARLY COSTS $2,609,714
RECOMMENDED SAVINGS* $173,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,394 $440 $787
18,304
kWh
$607
-
kW-mo/yr
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $28,719 $50,000 - - $28,719
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,416 $4,211 $1,883
43,800
kWh
$2,269
-
kW-mo/yr
- - $264
04 2.7135: Install occupancy sensors $1,650 $2,700 $1,650
38,368
kWh
- - - -
05 2.7144: Install spectral reflectors / delamp $8,418 $1,920 $2,721
63,284
kWh
$2,099
-
kW-mo/yr
- - $3,598
06 3.4116: Meter recycled water (to reduce sewer charges) $55,889 $160 - - - $55,889
-
Tgal
-
07 2.2622: Replace existing chiller with high efficiency model $70,665 $233,814 $16,423
373,248
kWh
$13,925
-
kW-mo/yr
$40,317
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,816 $3,021 $1,816
42,227
kWh
- - - -
09 2.1135: Repair furnaces and oven doors so that they seal efficiently $409 $1,200 - - $409
-
MMBtu
- -
TOTAL RECOMMENDED $173,376 $297,466 $25,280
579,231
kWh
$18,900
-
kW-mo/yr
$69,445
-
MMBtu
$55,889
-
Tgal
$3,862
TOTAL IMPLEMENTED $134,845 $245,106 $21,772
497,643
kWh
$16,194
-
kW-mo/yr
$40,726
-
MMBtu
$55,889
-
Tgal
$264
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings