Assessment Year | 2019 |
---|---|
Principal Product | Cookies |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 700 |
Plant Area |
400,000
ft2
|
Annual Production | 232,000,000
lb
|
Production Hrs. Annual | 6,840
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $798,465 | 18,536,800 |
kWh
|
$0.043 | |
Electricity Demand | $664,704 | 35,154 |
kW-mo/yr
|
$18.91 | |
Natural Gas | $1,013,333 | 259,216 |
MMBtu
|
$3.91 | |
Waste Disposal Costs | |||||
Water Usage | $41,654 | 14,867,096 |
Tgal
|
$0.003 | |
Water Disposal | $91,558 | 14,867 |
Tgal
|
$6.16 | |
TOTAL YEARLY COSTS | $2,609,714 | ||||
RECOMMENDED SAVINGS* | $173,376 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $134,845 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,394 | $440 |
$787
18,304
kWh
|
$607
-
kW-mo/yr
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $28,719 | $50,000 | - | - |
$28,719
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,416 | $4,211 |
$1,883
43,800
kWh
|
$2,269
-
kW-mo/yr
|
- | - | $264 | |
04 | 2.7135: Install occupancy sensors | $1,650 | $2,700 |
$1,650
38,368
kWh
|
- | - | - | - | |
05 | 2.7144: Install spectral reflectors / delamp | $8,418 | $1,920 |
$2,721
63,284
kWh
|
$2,099
-
kW-mo/yr
|
- | - | $3,598 | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $55,889 | $160 | - | - | - |
$55,889
-
Tgal
|
- | |
07 | 2.2622: Replace existing chiller with high efficiency model | $70,665 | $233,814 |
$16,423
373,248
kWh
|
$13,925
-
kW-mo/yr
|
$40,317
-
MMBtu
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,816 | $3,021 |
$1,816
42,227
kWh
|
- | - | - | - | |
09 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $409 | $1,200 | - | - |
$409
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $173,376 | $297,466 |
$25,280
579,231
kWh
|
$18,900
-
kW-mo/yr
|
$69,445
-
MMBtu
|
$55,889
-
Tgal
|
$3,862 | ||
TOTAL IMPLEMENTED | $134,845 | $245,106 |
$21,772
497,643
kWh
|
$16,194
-
kW-mo/yr
|
$40,726
-
MMBtu
|
$55,889
-
Tgal
|
$264 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs