ITAC Assessment: MZ0261
ITAC logo
ITAC Assessment: MZ0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product plastic sprayers and dispensers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 465,000
ft2
Annual Production 407,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,232,991 30,343,636
kWh
Electricity Demand $502,349 53,129
kW-mo/yr
Natural Gas $7,347 5,555
MMBtu
Waste Disposal Costs
Water Usage $132,426 12,275,600
Tgal
TOTAL YEARLY COSTS $2,875,112
RECOMMENDED SAVINGS* $248,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $241,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $71,753 $36,641 $58,001
794,531
kWh
$11,613
-
kW-mo/yr
$2,139
02 2.4231: Reduce the pressure of compressed air to the minimum required $61,928 $33,392 $52,401
717,824
kWh
$9,527
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $466 - $394
5,400
kWh
$72
-
kW-mo/yr
-
04 2.2625: Chill water to the highest temperature possible $107,654 $78,000 $87,719
1,201,628
kWh
$19,935
-
kW-mo/yr
-
05 3.7391: Implement a maintenance program to keep racks and tanks free of rust, cracks, or corrosion $163 - $163
2,230
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $7,011 $14,440 $5,954
81,570
kWh
$1,057
-
kW-mo/yr
-
TOTAL RECOMMENDED $248,975 $162,473 $204,632
2,803,183
kWh
$42,204
-
kW-mo/yr
$2,139
TOTAL IMPLEMENTED $241,964 $148,033 $198,678
2,721,613
kWh
$41,147
-
kW-mo/yr
$2,139
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs