Assessment Year | 2018 |
---|---|
Principal Product | Aluminum and zinc die castings |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 171 |
Plant Area |
108,035
ft2
|
Annual Production | 26,000,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $436,355 | 5,977,443 |
kWh
|
$0.073 | |
Electricity Demand | $54,905 | 16,894 |
kW-mo/yr
|
$3.25 | |
Natural Gas | $331,960 | 44,427 |
MMBtu
|
$7.47 | |
Waste Disposal Costs | |||||
Water Usage | $17,692 | 2,581,000 |
Tgal
|
$0.007 | |
TOTAL YEARLY COSTS | $840,913 | ||||
RECOMMENDED SAVINGS* | $87,898 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $87,898 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,653 | $180 |
$2,434
34,381
kWh
|
$219
-
kW-mo/yr
|
- | - | |
02 | 2.2515: Use optimum thickness insulation | $49,702 | $20,960 | - | - |
$49,702
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $13,434 | $10,000 | - | - |
$13,434
-
MMBtu
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,856 | $10,840 |
$1,614
22,116
kWh
|
$242
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $5,499 | $52,000 |
$5,057
69,278
kWh
|
$442
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $384 | $1,000 |
$384
5,263
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,370 | $57,615 |
$5,349
73,275
kWh
|
$509
-
kW-mo/yr
|
- | $8,512 | |
TOTAL RECOMMENDED | $87,898 | $152,595 |
$14,838
204,313
kWh
|
$1,412
-
kW-mo/yr
|
$63,136
-
MMBtu
|
$8,512 | ||
TOTAL IMPLEMENTED | $87,898 | $152,595 |
$14,838
204,313
kWh
|
$1,412
-
kW-mo/yr
|
$63,136
-
MMBtu
|
$8,512 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs