ITAC Assessment: MZ0239
ITAC logo
ITAC Assessment: MZ0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Fabricated structural steel trusses for bridges
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 170
Plant Area 320,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,010 2,354,330
kWh
Electricity Demand $30,509 12,873
kW-mo/yr
Natural Gas $3,869 881
MMBtu
TOTAL YEARLY COSTS $370,388
RECOMMENDED SAVINGS* $34,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,645

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,680 - $6,680
47,042
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $605 - $605
4,207
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $70 - $70
492
kWh
- - -
04 2.2437: Recover waste heat from equipment $3,933 $1,539 - - $3,933
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,398 $22,603 $13,562
95,040
kWh
$676
-
kW-mo/yr
- $4,160
06 2.7111: Reduce illumination to minimum necessary levels $403 $100 $384
2,688
kWh
$19
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $1,231 $950 $1,142
8,005
kWh
$88
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,326 $200 $3,236
22,672
kWh
$90
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,645 $25,392 $25,679
180,146
kWh
$874
-
kW-mo/yr
$3,933
-
MMBtu
$4,160
TOTAL IMPLEMENTED $34,645 $25,392 $25,679
180,146
kWh
$874
-
kW-mo/yr
$3,933
-
MMBtu
$4,160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs