ITAC Assessment: MZ0211
ITAC logo
ITAC Assessment: MZ0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product wood pallets, grass seed treatment
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 709,175
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 5,300
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $878,392 7,659,214
kWh
Natural Gas $142,362 17,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,252 - $1,252
11,373
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,128 $18,292 $26,128
237,526
kWh
03 2.7135: Install occupancy sensors $3,021 $882 $3,021
27,464
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,271 $950 $7,271
66,103
kWh
05 2.9114: Use solar heat to make electricty $150,150 $1,435,000 $150,150
1,365,000
kWh
TOTAL RECOMMENDED $187,823 $1,455,124 $187,823
1,707,466
kWh
TOTAL IMPLEMENTED $37,673 $20,124 $37,673
342,466
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs