ITAC Assessment: MZ0196
ITAC logo
ITAC Assessment: MZ0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product infrared panel and oven
NAICS 333994: Industrial Process Furnace and Oven Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 25,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 3,150
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,917 892,800
kWh
Electricity Demand $29,414 10,782
kW-mo/yr
Natural Gas $1,248 96
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $1,679 $10,800 $1,507
16,425
kWh
$172
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $1,588 $1,200 $1,520
16,561
kWh
$68
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,414 $11,400 $2,168
23,625
kWh
$246
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,428 $500 $1,428
15,566
kWh
-
TOTAL RECOMMENDED $7,109 $23,900 $6,623
72,177
kWh
$486
-
kW-mo/yr
TOTAL IMPLEMENTED $4,002 $12,600 $3,688
40,186
kWh
$314
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs