ITAC Assessment: MZ0170
ITAC logo
ITAC Assessment: MZ0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Flight simulator
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 140,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,120 2,480,569
kWh
Electricity Demand $14,439 6,528
kW-mo/yr
Natural Gas $31,003 4,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $56,753 $214,172 $42,420
505,600
kWh
$14,333
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $4,189 $17,018 $4,041
48,159
kWh
$148
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $14,117 - $7,814
93,137
kWh
$299
-
kW-mo/yr
$6,004
-
MMBtu
04 4.512: Condense operation into one building $11,328 - $8,209
97,845
kWh
$504
-
kW-mo/yr
$2,615
-
MMBtu
TOTAL RECOMMENDED $86,387 $231,190 $62,484
744,741
kWh
$15,284
-
kW-mo/yr
$8,619
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs