Assessment Year | 2015 |
---|---|
Principal Product | Flight simulator |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3721: Aircraft |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
140,000
ft2
|
Annual Production | 10
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $208,120 | 2,480,569 |
kWh
|
$0.084 |
Electricity Demand | $14,439 | 6,528 |
kW-mo/yr
|
$2.21 |
Natural Gas | $31,003 | 4,921 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,387 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $56,753 | $214,172 |
$42,420
505,600
kWh
|
$14,333
-
kW-mo/yr
|
- | |
02 | 2.7425: Clean or color roof to reduce solar load | $4,189 | $17,018 |
$4,041
48,159
kWh
|
$148
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $14,117 | - |
$7,814
93,137
kWh
|
$299
-
kW-mo/yr
|
$6,004
-
MMBtu
|
|
04 | 4.512: Condense operation into one building | $11,328 | - |
$8,209
97,845
kWh
|
$504
-
kW-mo/yr
|
$2,615
-
MMBtu
|
|
TOTAL RECOMMENDED | $86,387 | $231,190 |
$62,484
744,741
kWh
|
$15,284
-
kW-mo/yr
|
$8,619
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs