Assessment Year | 2014 |
---|---|
Principal Product | power coating resin |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 21 |
Plant Area |
192,000
ft2
|
Annual Production | 19,000,000
lb
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,187 | 3,228,320 |
kWh
|
$0.067 |
Electricity Demand | $39,947 | 7,200 |
kW-mo/yr
|
$5.55 |
Natural Gas | $290,894 | 65,259 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,084 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $51,046 | $118,500 |
$45,781
680,260
kWh
|
$5,265
-
kW-mo/yr
|
- | - | |
02 | 2.2511: Insulate bare equipment | $428 | $1,200 | - | - |
$428
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $1,973 | $1,599 | - | - |
$1,973
-
MMBtu
|
- | |
04 | 2.2121: Increase amount of condensate returned | $12,895 | $37,500 | - | - |
$8,665
-
MMBtu
|
$4,230
-
Tgal
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,788 | $23,000 |
$6,985
103,785
kWh
|
$803
-
kW-mo/yr
|
- | - | |
06 | 2.7134: Use photocell controls | $5,170 | $1,000 |
$5,170
76,815
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $79,300 | $182,799 |
$57,936
860,860
kWh
|
$6,068
-
kW-mo/yr
|
$11,066
-
MMBtu
|
$4,230
-
Tgal
|
||
TOTAL IMPLEMENTED | $23,084 | $63,299 |
$6,985
103,785
kWh
|
$803
-
kW-mo/yr
|
$11,066
-
MMBtu
|
$4,230
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs