ITAC Assessment: MZ0130
ITAC logo
ITAC Assessment: MZ0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Electrica heaters and equipment
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 190
Plant Area 90,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,287 3,241,540
kWh
Natural Gas $18,219 3,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,164 $1,000 $1,164
13,956
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $2,092 $5,800 - $2,092
-
MMBtu
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $17,041 $5,200 $17,041
198,151
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,911 $36,015 $8,911
103,620
kWh
-
05 2.2511: Insulate bare equipment $49,337 $60,000 $49,337
573,684
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,741 - $1,741
20,242
kWh
-
TOTAL RECOMMENDED $80,285 $108,015 $78,194
909,653
kWh
$2,092
-
MMBtu
TOTAL IMPLEMENTED $27,116 $42,215 $27,116
315,727
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs