ITAC Assessment: MZ0119
ITAC logo
ITAC Assessment: MZ0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product compost potting
NAICS 325314: Fertilizer (Mixing Only) Manufacturing
SIC 2873: Nitrogenous Fertilizers
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 80,200
ft2
Annual Production 120
ton
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,862 432,728
kWh
Electricity Demand $3,790 1,416
kW-mo/yr
Natural Gas $49,017 4,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,963 - - - $2,963
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,154 $14,260 $6,751
96,447
kWh
$1,403
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,150 $900 $1,150
16,435
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $1,728 - $735
10,498
kWh
$42
-
kW-mo/yr
$951
-
MMBtu
TOTAL RECOMMENDED $13,995 $15,160 $8,636
123,380
kWh
$1,445
-
kW-mo/yr
$3,914
-
MMBtu
TOTAL IMPLEMENTED $12,267 $15,160 $7,901
112,882
kWh
$1,403
-
kW-mo/yr
$2,963
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs