ITAC Assessment: MZ0100
ITAC logo
ITAC Assessment: MZ0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product low voltage circuit breakers
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 274
Plant Area 164,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,403 5,707,390
kWh
Natural Gas $20,668 1,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7144: Install spectral reflectors / delamp $10,313 $2,550 $10,313
128,908
kWh
02 2.7229: Air condition only space necessary $4,220 $4,000 $4,220
52,746
kWh
03 2.4239: Eliminate or reduce compressed air usage $32,458 $30,000 $32,458
405,721
kWh
TOTAL RECOMMENDED $46,990 $36,550 $46,990
587,375
kWh
TOTAL IMPLEMENTED $42,770 $32,550 $42,770
534,630
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs