Assessment Year | 2012 |
---|---|
Principal Product | vinyl vinders and cases |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 78 |
Plant Area |
150,000
ft2
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,124 | 610,200 |
kWh
|
$0.17 |
Electricity Demand | $61,041 | 3,786 |
kW-mo/yr
|
$16.12 |
Natural Gas | $13,605 | 1,423 |
MMBtu
|
$9.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,599 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,819 | - |
$6,963
41,200
kWh
|
$3,856
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,028 | $35,700 |
$18,071
106,929
kWh
|
$9,957
-
kW-mo/yr
|
- | |
03 | 4.512: Condense operation into one building | $13,624 | - |
$8,558
50,647
kWh
|
$5,066
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,580 | $850 |
$4,834
28,603
kWh
|
$2,746
-
kW-mo/yr
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,554 | - | - |
$12,554
-
kW-mo/yr
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,548 | $600 |
$1,643
9,722
kWh
|
$905
-
kW-mo/yr
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $306 | - | - | - |
$306
-
MMBtu
|
|
TOTAL RECOMMENDED | $75,459 | $37,150 |
$40,069
237,101
kWh
|
$35,084
-
kW-mo/yr
|
$306
-
MMBtu
|
||
TOTAL IMPLEMENTED | $62,599 | $37,150 |
$40,069
237,101
kWh
|
$22,530
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs