ITAC Assessment: MZ0075
ITAC logo
ITAC Assessment: MZ0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product books
NAICS 323120: Support Activities for Printing
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 1,050,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $623,822 9,409,837
kWh
Electricity Demand $38,333 18,044
kW-mo/yr
Natural Gas $85,452 7,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,468 $1,000 - $15,468
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,400 $1,500 - - $8,400
-
MMBtu
03 2.7135: Install occupancy sensors $45,695 $2,700 $45,695
761,594
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $32,479 $29,900 $32,479
466,650
kWh
- -
05 2.7135: Install occupancy sensors $5,629 $1,700 $5,629
93,820
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,845 $6,160 $4,845
69,615
kWh
- -
TOTAL RECOMMENDED $112,516 $42,960 $88,648
1,391,679
kWh
$15,468
-
kW-mo/yr
$8,400
-
MMBtu
TOTAL IMPLEMENTED $97,048 $41,960 $88,648
1,391,679
kWh
- $8,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings