ITAC Assessment: AM0033
ITAC logo
ITAC Assessment: AM0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CATTLE & HORSES PROCESS
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 108,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $465,245 10,709,848
kWh
Natural Gas $162,553 56,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $9,218 $49,800 $(-1,542.0)
(-54,513)
kWh
$10,760
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $4,089 $6,575 $4,089
144,490
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,800 $16,400 $3,800
56,272
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,454 $810 - $3,454
-
MMBtu
-
05 2.2515: Use optimum thickness insulation $2,827 $4,000 $2,827
84,115
kWh
- -
06 2.2511: Insulate bare equipment $4,496 $11,180 - $2,746
-
MMBtu
$1,750
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,210 $11,080 $2,210
32,239
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,107 - $2,107
74,443
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $144 $460
6,741
kWh
- -
10 3.4154: Eliminate leaks in water lines and valves $393 $300 - $393
-
MMBtu
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $279 $1,000 $279
9,965
kWh
- -
12 2.7121: Utilize daylight whenever possible in lieu of artificial light $135 - $135
4,689
kWh
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $50 $152 $50
879
kWh
- -
TOTAL RECOMMENDED $33,518 $101,441 $14,415
359,320
kWh
$17,353
-
MMBtu
$1,750
TOTAL IMPLEMENTED $3,847 $1,110 - $3,847
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs