Assessment Year | 1988 |
---|---|
Principal Product | CATTLE & HORSES PROCESS |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 108,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $465,245 | 10,709,848 |
kWh
|
$0.043 |
Natural Gas | $162,553 | 56,300 |
MMBtu
|
$2.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,518 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,847 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $9,218 | $49,800 |
$(-1,542.0)
(-54,513)
kWh
|
$10,760
-
MMBtu
|
- | |
02 | 2.2515: Use optimum thickness insulation | $4,089 | $6,575 |
$4,089
144,490
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,800 | $16,400 |
$3,800
56,272
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,454 | $810 | - |
$3,454
-
MMBtu
|
- | |
05 | 2.2515: Use optimum thickness insulation | $2,827 | $4,000 |
$2,827
84,115
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $4,496 | $11,180 | - |
$2,746
-
MMBtu
|
$1,750 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,210 | $11,080 |
$2,210
32,239
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,107 | - |
$2,107
74,443
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $460 | $144 |
$460
6,741
kWh
|
- | - | |
10 | 3.4154: Eliminate leaks in water lines and valves | $393 | $300 | - |
$393
-
MMBtu
|
- | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $279 | $1,000 |
$279
9,965
kWh
|
- | - | |
12 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $135 | - |
$135
4,689
kWh
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50 | $152 |
$50
879
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,518 | $101,441 |
$14,415
359,320
kWh
|
$17,353
-
MMBtu
|
$1,750 | ||
TOTAL IMPLEMENTED | $3,847 | $1,110 | - |
$3,847
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs