| Assessment Year | 2011 |
|---|---|
| Principal Product | laminated paper products |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2759: Commercial Printing, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
75,000
ft2
|
| Annual Production | 250
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $159,763 | 2,299,200 |
kWh
|
$0.069 |
| Natural Gas | $15,326 | 2,545 |
MMBtu
|
$6.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,397 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,904 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,600 | $12,500 |
$12,600
166,900
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,500 | $15,300 |
$15,500
159,468
kWh
|
|
| 03 | 2.7135: Install occupancy sensors | $638 | $760 |
$638
9,120
kWh
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $9,393 | $4,500 |
$9,393
135,549
kWh
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,698 | $850 |
$1,698
24,618
kWh
|
|
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $16,120 | - |
$16,120
220,812
kWh
|
|
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,750 | - |
$7,750
79,572
kWh
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,698 | - |
$1,698
24,618
kWh
|
|
| TOTAL RECOMMENDED | $65,397 | $33,910 |
$65,397
820,657
kWh
|
||
| TOTAL IMPLEMENTED | $27,904 | $1,610 |
$27,904
358,740
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs