ITAC Assessment: MZ0044
ITAC logo
ITAC Assessment: MZ0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Aluminum door/windor frame
NAICS 331313: Alumina Refining and Primary Aluminum Production
SIC 3334: Primary Production of Aluminum
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 125,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,606 2,647,200
kWh
Natural Gas $222,163 20,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,288 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,991 $38,600 $14,991
225,403
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $5,600 $1,160
16,140
kWh
-
03 2.7135: Install occupancy sensors $802 $460 $802
13,062
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,600 $850 $15,600
234,110
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,268 - $2,268
36,945
kWh
-
06 2.2437: Recover waste heat from equipment $15,312 $10,000 - $15,312
-
MMBtu
07 2.2437: Recover waste heat from equipment $11,155 $10,000 - $11,155
-
MMBtu
TOTAL RECOMMENDED $61,288 $65,510 $34,821
525,660
kWh
$26,467
-
MMBtu
TOTAL IMPLEMENTED $31,751 $45,050 $31,751
475,653
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs