ITAC Assessment: MZ0018
ITAC logo
ITAC Assessment: MZ0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Electric transformer core
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 25,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,087 484,898
kWh
Natural Gas $58,090 4,293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $25,600 - $20,700
308,880
kWh
$4,900
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,872 - $10,438
153,504
kWh
$2,434
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $3,576 $2,450 $3,576
61,660
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,001 $2,500 - $1,001
-
kW-mo/yr
-
05 2.5194: Redesign process $5,616 - - - $5,616
-
lb
TOTAL RECOMMENDED $48,665 $4,950 $34,714
524,044
kWh
$8,335
-
kW-mo/yr
$5,616
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs