ITAC Assessment: MUWT05
ITAC logo
ITAC Assessment: MUWT05
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 10
Plant Area 76,600
ft2
Annual Production 1,016,160
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,531 799,104
kWh
Electricity Demand $75,471 3,049
kW-mo/yr
Electricity Fees $13,267 -
Natural Gas $67,974 10,658
MMBtu
TOTAL YEARLY COSTS $218,244
RECOMMENDED SAVINGS* $15,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $3,094 $9,376 - - $3,094
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,300 $2,373 $913
11,409
kWh
$387
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $178 - $126
1,573
kWh
$52
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $68 $20 $48
601
kWh
$20
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $766 $2,052 $192
2,395
kWh
$574
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $124 $49 $87
1,083
kWh
$37
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $5 - $3
35
kWh
$2
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $707 $2,816 $311
3,887
kWh
$396
-
kW-mo/yr
-
09 2.7291: Reschedule and rearrange multiple-source heating systems $2,580 $543 $1,812
22,644
kWh
$768
-
kW-mo/yr
-
10 2.9114: Use solar heat to make electricty $6,236 $61,596 $4,953
61,915
kWh
$1,283
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,057 $78,825 $8,444
105,542
kWh
$3,520
-
kW-mo/yr
$3,094
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs