ITAC Assessment: MUWT01
ITAC logo
ITAC Assessment: MUWT01
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 5
Plant Area 15,800
ft2
Annual Production 450,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,916 1,537,725
kWh
Electricity Demand $42,734 2,501
kW-mo/yr
Electricity Fees $31,425 -
Natural Gas $10,318 1,160
MMBtu
TOTAL YEARLY COSTS $148,393
RECOMMENDED SAVINGS* $127,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $834

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $70 - $70
1,747
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $539 $2,176 $539
13,477
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $206 $960 $196
4,906
kWh
$10
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $715 - - - $715
-
MMBtu
-
05 2.7444: Close holes and openings in building such as broken windows $120 - $40
1,003
kWh
- $79
-
MMBtu
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $126,128 $453,578 - - - $126,128
TOTAL RECOMMENDED $127,777 $456,714 $845
21,133
kWh
$10
-
kW-mo/yr
$794
-
MMBtu
$126,128
TOTAL IMPLEMENTED $834 - $40
1,003
kWh
- $794
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs