ITAC Assessment: MUCM26
ITAC logo
ITAC Assessment: MUCM26
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product religious services
NAICS 813110: Religious Organizations
SIC 8661: Religious Organizations
Sales Range less than $500
k
# of Employees 6
Plant Area 20,000
ft2
Annual Production 1
units
Production Hrs. Annual 1,800
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,913 30,260
kWh
Electricity Fees $1,584 -
Natural Gas $7,753 1,024
MMBtu
Other Gas $1,388 1
MMBtu
Waste Disposal Costs
Water Usage $1,202 200
Tgal
Water Disposal $1,616 200
Tgal
Other Liquid (haz) $1,048 1
gal
TOTAL YEARLY COSTS $19,504
RECOMMENDED SAVINGS* $3,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $2,717 - - - $2,717
02 2.2211: Use optimum temperature $32 - - $32
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $58 - $58
360
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $547 $1,881 $547
3,417
kWh
- -
05 2.7291: Reschedule and rearrange multiple-source heating systems $171 - $171
1,071
kWh
- -
06 2.9114: Use solar heat to make electricty $379 $2,196 $379
2,371
kWh
- -
TOTAL RECOMMENDED $3,904 $4,077 $1,155
7,220
kWh
$32
-
MMBtu
$2,717
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs