ITAC Assessment: MUCM13
ITAC logo
ITAC Assessment: MUCM13
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product NONE
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 95
Plant Area 69,704
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,090 286,635
kWh
Electricity Demand $4,994 6,465
kW-mo/yr
Natural Gas $26,843 5,104
MMBtu
TOTAL YEARLY COSTS $55,927
RECOMMENDED SAVINGS* $2,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $434

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $132 $675 - - $132
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4 $20 $4
30
kWh
- -
03 2.6218: Turn off equipment when not in use $1,369 $100 $543
3,623
kWh
- $826
-
MMBtu
04 2.7135: Install occupancy sensors $298 $42 $298
1,986
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $382 - $373
5,322
kWh
$9
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,185 $837 $1,218
10,961
kWh
$9
-
kW-mo/yr
$957
-
MMBtu
TOTAL IMPLEMENTED $434 $737 $302
2,016
kWh
- $132
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs