ITAC Assessment: BS0150
ITAC logo
ITAC Assessment: BS0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Excavator equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 401,314
ft2
Annual Production 275
units
Production Hrs. Annual 2,184
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,823 138,520
kWh
Electricity Fees $10,150 -
Natural Gas $2,075 674
MMBtu
TOTAL YEARLY COSTS $21,048
RECOMMENDED SAVINGS* $2,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $937 $22 $937
14,633
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $629 $375 $629
9,828
kWh
03 2.7135: Install occupancy sensors $151 $180 $151
2,359
kWh
04 2.7145: Install skylights $254 $2,020 $254
3,968
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $682 $1,180 $682
10,656
kWh
TOTAL RECOMMENDED $2,653 $3,777 $2,653
41,444
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs