ITAC Assessment: MUCM09
ITAC logo
ITAC Assessment: MUCM09
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product n/a
NAICS 611699: All Other Miscellaneous Schools and Instruction
SIC 8299: Schools and Educational Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 50
Plant Area 99,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,860
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,897 447,366
kWh
Electricity Fees $456 -
Natural Gas $32,602 4,744
MMBtu
TOTAL YEARLY COSTS $98,956
RECOMMENDED SAVINGS* $23,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,348 $15,420 $10,348
68,983
kWh
- -
02 4.463: Modify facility to avoid excess maintenance costs $6,200 $5,800 - - $6,200
03 2.6218: Turn off equipment when not in use $4,028 - $4,028
26,852
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,802 $1,650 $1,802
12,012
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $1,372 $2,635 $1,372
9,147
kWh
- -
06 2.7444: Close holes and openings in building such as broken windows $39 $27 $25
167
kWh
$14
-
MMBtu
-
TOTAL RECOMMENDED $23,789 $25,532 $17,575
117,161
kWh
$14
-
MMBtu
$6,200
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs