ITAC Assessment: MU0091
ITAC logo
ITAC Assessment: MU0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Automotive interior components and injection-molded plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 481
Plant Area 315,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 5,824
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $992,243 17,633,673
kWh
Electricity Demand $302,610 12,960
kW-mo/yr
Electricity Fees $78,615 -
Natural Gas $43,867 9,096
MMBtu
Waste Disposal Costs
Water Usage $6,615 750
Tgal
TOTAL YEARLY COSTS $1,423,950
RECOMMENDED SAVINGS* $152,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $58,514 $898,400 $31,476
562,067
kWh
$27,038
-
kW-mo/yr
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $27,468 - $4,013
(-71,668)
kWh
$9,190
-
kW-mo/yr
$14,265
-
MMBtu
-
03 4.454: Modify startup/shutdown times $31,815 - $17,135
305,976
kWh
$14,680
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $12,469 $38,117 - - - $12,469
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,362 - $5,573
99,525
kWh
$4,789
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,092 $180 $587
10,489
kWh
$504
-
kW-mo/yr
- -
07 2.7111: Reduce illumination to minimum necessary levels $891 - $480
8,561
kWh
$411
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $243 $1,260 $117
2,079
kWh
$126
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $183 $867 $116
2,085
kWh
$68
-
kW-mo/yr
- -
10 2.7221: Lower temperature during the winter season and vice-versa $2,320 - $667
11,909
kWh
$1,215
-
kW-mo/yr
$438
-
MMBtu
-
11 2.7261: Install timers and/or thermostats $233 $520 - - $233
-
MMBtu
-
12 4.821: Pay bills on time to avoid late fees $6,768 - - - - $6,768
TOTAL RECOMMENDED $152,358 $939,344 $60,164
931,023
kWh
$58,021
-
kW-mo/yr
$14,936
-
MMBtu
$19,237
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs