ITAC Assessment: MU0040
ITAC logo
ITAC Assessment: MU0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Gas Tanks
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 161
Plant Area 160,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $772,074 15,944,822
kWh
Electricity Demand $149,215 35,265
kW-mo/yr
Electricity Fees $42,133 -
Natural Gas $51,428 10,650
MMBtu
Waste Disposal Costs
Water Usage $19,325 2,829,684
Tgal
Water Disposal $109,364 2,825,574
Tgal
TOTAL YEARLY COSTS $1,143,539
RECOMMENDED SAVINGS* $182,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $106,121 $1,404,000 $104,640
2,180,000
kWh
$1,481
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $213 $315 $190
3,954
kWh
$23
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,004 $41 $4,901
102,111
kWh
$103
-
kW-mo/yr
- - - -
04 3.4151: Minimize water usage $68,486 $150,124 - - - $7,317
-
Tgal
$40,766
-
Tgal
$20,403
05 4.821: Pay bills on time to avoid late fees $2,306 - - - $2,306 - - -
TOTAL RECOMMENDED $182,130 $1,554,480 $109,731
2,286,065
kWh
$1,606
-
kW-mo/yr
$2,306 $7,317
-
Tgal
$40,766
-
Tgal
$20,403
TOTAL IMPLEMENTED $5,217 $356 $5,091
106,065
kWh
$126
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs