ITAC Assessment: MU0027
ITAC logo
ITAC Assessment: MU0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chassis Components
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 379
Plant Area 150,000
ft2
Annual Production 6,120,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,873 10,185,280
kWh
Electricity Demand $390,815 22,828
kW-mo/yr
Electricity Fees $143,734 -
Natural Gas $106,913 15,872
MMBtu
TOTAL YEARLY COSTS $1,039,336
RECOMMENDED SAVINGS* $33,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $12,446 - $1,743
44,687
kWh
- $10,703
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $627 $792 $334
8,556
kWh
$293
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $1,030 - $1,030
26,400
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $42 - $42
1,071
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $23 $24 $23
599
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $5,992 - - - $5,992
-
MMBtu
07 2.7224: Reduce space conditioning during non-working hours $2,660 - $613
15,720
kWh
$369
-
kW-mo/yr
$1,679
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $8,266 $9,146 $1,122
28,757
kWh
- $7,144
-
MMBtu
09 2.7492: Use proper thickness of insulation on building envelope $2,480 $6,400 $235
6,029
kWh
- $2,244
-
MMBtu
TOTAL RECOMMENDED $33,565 $16,362 $5,141
131,819
kWh
$662
-
kW-mo/yr
$27,762
-
MMBtu
TOTAL IMPLEMENTED $31,086 $9,962 $4,906
125,790
kWh
$662
-
kW-mo/yr
$25,518
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs