| Assessment Year | 2026 |
|---|---|
| Principal Product | Thermoplastic Parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 10 |
| Plant Area |
22,500
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $32,258 | 439,760 |
kWh
|
$0.073 | |
| Electricity Demand | $6,387 | 2,349 |
kW-mo/yr
|
$2.72 | |
| Electricity Fees | $708 | - |
|
- | |
| LPG | $327 | 16 |
MMBtu
|
$20.44 | |
| Waste Disposal Costs | |||||
| Water Usage | $324 | 39 |
Tgal
|
$8.31 | |
| Water Disposal | $382 | 39 |
Tgal
|
$9.79 | |
| TOTAL YEARLY COSTS | $40,386 | ||||
| RECOMMENDED SAVINGS* | $7,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $159 | $540 |
$159
2,178
kWh
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $491 | $2,310 |
$491
6,720
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $50 | - |
$50
677
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $979 | $1,323 |
$850
11,637
kWh
|
$129
-
kW-mo/yr
|
- | |
| 05 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $10 | - | - | - |
$10
-
lb
|
|
| 06 | 2.7224: Reduce space conditioning during non-working hours | $6,122 | - |
$6,122
83,630
kWh
|
- | - | |
| 07 | 2.2625: Chill water to the highest temperature possible | $126 | - |
$126
1,726
kWh
|
- | - | |
| TOTAL RECOMMENDED | $7,937 | $4,173 |
$7,798
106,568
kWh
|
$129
-
kW-mo/yr
|
$10
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs