ITAC Assessment: MS0462
ITAC logo
ITAC Assessment: MS0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 55,000
ft2
Annual Production 13,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,614 2,601,300
kWh
Electricity Demand $17,316 6,687
kW-mo/yr
Electricity Fees $48,438 -
TOTAL YEARLY COSTS $276,368
RECOMMENDED SAVINGS* $77,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $533 $3,825 $533
6,576
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,048 $1,973 $5,048
62,323
kWh
-
03 2.4321: Upgrade obsolete equipment $7,585 $97,765 $7,585
94,816
kWh
-
04 2.7135: Install occupancy sensors $868 $1,889 $868
10,712
kWh
-
05 2.9114: Use solar heat to make electricty $58,484 $501,281 $54,538
673,865
kWh
$3,946
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $4,587 $19,764 $4,587
56,629
kWh
-
TOTAL RECOMMENDED $77,105 $626,497 $73,159
904,921
kWh
$3,946
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs