| Assessment Year | 2025 |
|---|---|
| Principal Product | Carpet Underlay |
| NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 88 |
| Plant Area |
338,650
ft2
|
| Annual Production | 50,000
units
|
| Production Hrs. Annual | 5,616
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $224,458 | 2,471,458 |
kWh
|
$0.091 | |
| Electricity Demand | $221,566 | 16,215 |
kW-mo/yr
|
$13.66 | |
| Natural Gas | $110,755 | 16,996 |
MMBtu
|
$6.52 | |
| LPG | $80,471 | 2,474 |
MMBtu
|
$32.53 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,194 | 2,314 |
Tgal
|
$3.54 | |
| Water Disposal | $7,214 | 2,314 |
Tgal
|
$3.12 | |
| TOTAL YEARLY COSTS | $652,658 | ||||
| RECOMMENDED SAVINGS* | $178,751 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $11,459 | $11,270 |
$11,459
126,173
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,302 | $1,740 |
$4,302
47,369
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,296 | $47,212 |
$47,296
520,729
kWh
|
- | - | |
| 04 | 2.4321: Upgrade obsolete equipment | $46,155 | $90,967 | - |
$46,155
-
MMBtu
|
- | |
| 05 | 2.4321: Upgrade obsolete equipment | $3,803 | $32,650 |
$3,803
41,879
kWh
|
- | - | |
| 06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $65,736 | $455,000 |
$(-14,735.0)
(-162,240)
kWh
|
- |
$80,471
-
MMBtu
|
|
| TOTAL RECOMMENDED | $178,751 | $638,839 |
$52,125
573,910
kWh
|
$46,155
-
MMBtu
|
$80,471
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs