ITAC Assessment: MS0436
ITAC logo
ITAC Assessment: MS0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hydraulic Cylinders
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 135,000
ft2
Annual Production 120,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,630 3,328,200
kWh
Electricity Demand $103,527 10,353
kW-mo/yr
Electricity Fees $29,275 -
Natural Gas $70,240 10,155
MMBtu
LPG $15,972 534
MMBtu
Waste Disposal Costs
Water Usage $24,305 7,833
Tgal
TOTAL YEARLY COSTS $482,949
RECOMMENDED SAVINGS* $70,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings LPG Savings
01 2.7132: Install timers on light switches in little used areas $4,420 $255 $4,420
63,149
kWh
- -
02 2.9114: Use solar heat to make electricty $52,267 $553,175 $52,267
746,460
kWh
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $13,430 $50,000 - - $13,430
-
MMBtu
04 2.3212: Optimize plant power factor $822 $15,226 - $822 -
TOTAL RECOMMENDED $70,939 $618,656 $56,687
809,609
kWh
$822 $13,430
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs